title: "Contractor Timesheet Template: Free Download + Complete Guide (2026)"
description: Free contractor timesheet template for 2026. Download daily and weekly construction timesheets with cost code tracking, overtime control, and job costing integration to reduce labor overruns.
image: https://blog.tasktag.com/hubfs/1%20-%202026-05-10T205439.538.jpg
---

[Skip to content](https://blog.tasktag.com/construction-timesheet-template-with-cost-code#main-content)

[![TaskTag logo](https://blog.tasktag.com/hubfs/tasktag-logo.svg)](https://www.tasktag.com)

- [Features](https://tasktag.com/features/photo-documentation/)
- [Pricing](https://tasktag.com/pricing)
- [Compare](https://tasktag.com/compare/companycam/)
- [Blog](https://blog.tasktag.com/)
- [Resources](https://blog.tasktag.com/product)

Open main navigation

Close main navigation

- [Features](https://tasktag.com/features/photo-documentation/)
- [Pricing](https://tasktag.com/pricing)
- [Compare](https://tasktag.com/compare/companycam/)
- [Blog](https://blog.tasktag.com/)
- [Resources](https://blog.tasktag.com/product)
- [Start For Free](https://app.tasktag.com/register/signup-with-email?_gl=1*1ic34dn*_ga*MjU5NjU5OTI3LjE3NzM5Nzc1Nzg.*_ga_B535V4B5ZV*czE3NzczMzU3MjgkbzQkZzAkdDE3NzczMzU3MjgkajYwJGwwJGgw)

[Start For Free](https://app.tasktag.com/register/signup-with-email?_gl=1*1ic34dn*_ga*MjU5NjU5OTI3LjE3NzM5Nzc1Nzg.*_ga_B535V4B5ZV*czE3NzczMzU3MjgkbzQkZzAkdDE3NzczMzU3MjgkajYwJGwwJGgw)

 May 11, 2026, 9:34:20 PM

# Contractor Timesheet Template: Free Download + Complete Guide (2026)

![Picture of Mak Pastrana](https://blog.tasktag.com/hs-fs/hubfs/profile-pic-circle.png?width=50&name=profile-pic-circle.png) [Mak Pastrana](https://blog.tasktag.com/author/mak-pastrana)

Share: [facebook-f icon](http://www.facebook.com/share.php?u=https://blog.tasktag.com/construction-timesheet-template-with-cost-code) [linkedin-in icon](http://www.linkedin.com/shareArticle?mini=true&url=https://blog.tasktag.com/construction-timesheet-template-with-cost-code) [Twitter icon](https://twitter.com/intent/tweet?url=https://blog.tasktag.com/construction-timesheet-template-with-cost-code) [pinterest-p icon](http://pinterest.com/pin/create/link/?url=https://blog.tasktag.com/construction-timesheet-template-with-cost-code) [envelope icon](mailto:?body=https://blog.tasktag.com/construction-timesheet-template-with-cost-code)

![Contractor Timesheet Template: Free Download + Complete Guide (2026)](https://blog.tasktag.com/hs-fs/hubfs/1%20-%202026-05-10T205439.538.jpg?width=1620&height=1215&name=1%20-%202026-05-10T205439.538.jpg)

Labor is the largest cost on most construction projects — and the hardest to control without reliable time tracking. [**CFMA found contractors who track labor by cost code earn margins 2–4 points higher**](https://tasktag.com/pricing)than those using summary timesheets or no tracking.

**Key Takeaways**

- Labor = **35–45% of total project costs** — the category with the most estimate variance
- [**Cost-coded timesheets**](https://app.tasktag.com/register/signup-with-email) are the minimum for job costing — summary hours alone don't cut it
- FLSA requires accurate hours records — signed timesheets are your compliance document
- Timesheet data feeding job costing is worth 10x more than data feeding payroll alone

## **3 Copy-Ready Templates**

![3 Copy-Ready Templates](https://blog.tasktag.com/hs-fs/hubfs/1%20-%202026-05-10T205445.318.jpg?width=800&height=600&name=1%20-%202026-05-10T205445.318.jpg)

### **Template 1: Daily Crew Timesheet**

*(Multi-crew sites, FLSA compliance, real-time cost tracking)*

DAILY CREW TIMESHEET

Company: \_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_

Project / Job #: \_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_ Date: \_\_\_\_\_\_\_\_\_\_\_

Foreman: \_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_

─────────────────────────────────────────────────────────────

WORKER TRADE TIME IN TIME OUT BREAK REG OT

─────────────────────────────────────────────────────────────

\_\_\_\_\_\_\_\_\_\_\_\_ \_\_\_\_\_\_ \_\_\_\_\_\_ \_\_\_\_\_\_\_ \_\_\_\_ \_\_\_ \_\_\_

\_\_\_\_\_\_\_\_\_\_\_\_ \_\_\_\_\_\_ \_\_\_\_\_\_ \_\_\_\_\_\_\_ \_\_\_\_ \_\_\_ \_\_\_

\_\_\_\_\_\_\_\_\_\_\_\_ \_\_\_\_\_\_ \_\_\_\_\_\_ \_\_\_\_\_\_\_ \_\_\_\_ \_\_\_ \_\_\_

─────────────────────────────────────────────────────────────

CREW TOTALS \_\_\_ \_\_\_

HOURS BY COST CODE

─────────────────────────────────────────────────────────────

\[ \] 100 — Demo / site prep \_\_\_\_\_\_\_ hrs

\[ \] 200 — Framing \_\_\_\_\_\_\_ hrs

\[ \] 300 — Rough MEP \_\_\_\_\_\_\_ hrs

\[ \] 400 — Insulation \_\_\_\_\_\_\_ hrs

\[ \] 500 — Drywall \_\_\_\_\_\_\_ hrs

\[ \] 600 — Finish carpentry \_\_\_\_\_\_\_ hrs

\[ \] 700 — Tile / flooring \_\_\_\_\_\_\_ hrs

\[ \] 800 — Paint \_\_\_\_\_\_\_ hrs

\[ \] 900 — Punch / cleanup \_\_\_\_\_\_\_ hrs

\[ \] 999 — Travel / non-billable \_\_\_\_\_\_\_ hrs

─────────────────────────────────────────────────────────────

TOTAL CODED: \_\_\_\_\_\_\_ (must equal crew total above)

Foreman Signature: \_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_ Date: \_\_\_\_\_\_\_\_\_\_

### **Template 2: Weekly Employee Timesheet**

*(Payroll processing, small crews)*

WEEKLY EMPLOYEE TIMESHEET

Employee: \_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_ Week Ending: \_\_\_\_\_\_\_\_

─────────────────────────────────────────────────────────────────

DAY JOB # COST CODE TIME IN TIME OUT BREAK HOURS

─────────────────────────────────────────────────────────────────

MON \_\_\_\_\_\_ \_\_\_\_\_\_\_\_\_ \_\_\_\_\_\_ \_\_\_\_\_\_\_ \_\_\_\_ \_\_\_\_\_

TUE \_\_\_\_\_\_ \_\_\_\_\_\_\_\_\_ \_\_\_\_\_\_ \_\_\_\_\_\_\_ \_\_\_\_ \_\_\_\_\_

WED \_\_\_\_\_\_ \_\_\_\_\_\_\_\_\_ \_\_\_\_\_\_ \_\_\_\_\_\_\_ \_\_\_\_ \_\_\_\_\_

THU \_\_\_\_\_\_ \_\_\_\_\_\_\_\_\_ \_\_\_\_\_\_ \_\_\_\_\_\_\_ \_\_\_\_ \_\_\_\_\_

FRI \_\_\_\_\_\_ \_\_\_\_\_\_\_\_\_ \_\_\_\_\_\_ \_\_\_\_\_\_\_ \_\_\_\_ \_\_\_\_\_

SAT \_\_\_\_\_\_ \_\_\_\_\_\_\_\_\_ \_\_\_\_\_\_ \_\_\_\_\_\_\_ \_\_\_\_ \_\_\_\_\_

─────────────────────────────────────────────────────────────────

REGULAR: \_\_\_\_\_ OVERTIME: \_\_\_\_\_

TOTAL: \_\_\_\_\_

HOURS BY JOB:

Job \_\_\_\_\_\_\_\_\_\_\_: \_\_\_\_\_ reg \_\_\_\_\_ OT

Job \_\_\_\_\_\_\_\_\_\_\_: \_\_\_\_\_ reg \_\_\_\_\_ OT

Employee Signature: \_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_ Date: \_\_\_\_\_\_\_\_\_\_

Supervisor Approval: \_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_ Date: \_\_\_\_\_\_\_\_\_\_

### **Template 3: Per-Job Labor Cost Sheet**

*(Track total labor from start to finish on one project)*

PER-JOB LABOR COST SHEET

Project: \_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_ Contract Value: $\_\_\_\_\_\_\_\_

─────────────────────────────────────────────────────────

PHASE EST HRS ACT HRS VARIANCE VAR %

─────────────────────────────────────────────────────────

Demo / Site Prep \_\_\_\_\_\_ \_\_\_\_\_\_ \_\_\_\_\_\_ \_\_\_\_%

Framing \_\_\_\_\_\_ \_\_\_\_\_\_ \_\_\_\_\_\_ \_\_\_\_%

Rough MEP \_\_\_\_\_\_ \_\_\_\_\_\_ \_\_\_\_\_\_ \_\_\_\_%

Drywall \_\_\_\_\_\_ \_\_\_\_\_\_ \_\_\_\_\_\_ \_\_\_\_%

Finish Carpentry \_\_\_\_\_\_ \_\_\_\_\_\_ \_\_\_\_\_\_ \_\_\_\_%

Tile / Flooring \_\_\_\_\_\_ \_\_\_\_\_\_ \_\_\_\_\_\_ \_\_\_\_%

Paint \_\_\_\_\_\_ \_\_\_\_\_\_ \_\_\_\_\_\_ \_\_\_\_%

Punch / Cleanup \_\_\_\_\_\_ \_\_\_\_\_\_ \_\_\_\_\_\_ \_\_\_\_%

─────────────────────────────────────────────────────────

TOTALS \_\_\_\_\_\_ \_\_\_\_\_\_ \_\_\_\_\_\_ \_\_\_\_%

LABOR COST SUMMARY

Worker Loaded Rate Reg Hrs OT Hrs Total

\_\_\_\_\_\_\_\_\_\_\_\_\_ $\_\_\_\_\_\_\_\_ \_\_\_\_\_\_ \_\_\_\_\_\_ $\_\_\_\_\_\_

\_\_\_\_\_\_\_\_\_\_\_\_\_ $\_\_\_\_\_\_\_\_ \_\_\_\_\_\_ \_\_\_\_\_\_ $\_\_\_\_\_\_

─────────────────────────────────────────────────────────

ACTUAL LABOR COST: $\_\_\_\_\_\_\_\_

ESTIMATED LABOR COST: $\_\_\_\_\_\_\_\_

VARIANCE: $\_\_\_\_\_\_\_\_ (\_\_\_%)

## **Standard Cost Codes**

| **Code** | **Phase** |
| --- | --- |
| 100 | Demo / site prep |
| 200 | Framing |
| 300–320 | Rough MEP (electrical/plumbing/HVAC) |
| 400 | Insulation |
| 500 | Drywall |
| 600–610 | Finish carpentry / cabinetry |
| 700–710 | Tile / flooring |
| 800–810 | Paint / fixtures |
| 900 | Punch / cleanup |
| 950 | Supervision |
| 999 | Travel / non-billable |

Keep it to **10–15 codes** — match exactly to your estimate line items.

## **Overtime Basics**

- [**Federal**](https://blog.tasktag.com/mastering-construction-project-management)**:** >40 hrs/week = 1.5× — the workweek is fixed, can't shift to dodge OT
- [**CA, AK, NV**](https://blog.tasktag.com/product)**:** daily OT applies (>8 hrs/day = 1.5×; >12 hrs = 2×)
- FLSA requires: daily hours, weekly totals, regular rate, OT earnings — daily timesheets satisfy all

Relevant Article:[Contractor Timesheet Template: Free Download + Complete Guide (2026)](https://blog.tasktag.com/construction-timesheet-template-with-cost-codes)

## **Implementation Rules**

**![Implementation Rules](https://blog.tasktag.com/hs-fs/hubfs/1%20-%202026-05-10T205450.696.jpg?width=800&height=600&name=1%20-%202026-05-10T205450.696.jpg)**

1. Fill out **end of each day on site** — not weekly from memory
2. [**Combine with daily repor**](https://blog.tasktag.com/tag/tasktag)**t** — one submission (construction daily report template)
3. **Foreman signs same day**
4. [**Employee signs weekly summary**](https://onelink.to/tasktagapp) before payroll runs
5. **Submit to office within 24 hours**

Connected systems: construction job costing · how to estimate construction costs · construction overhead and profit

*Sources: CFMA Labor Tracking Benchmarks 2024 · US DOL FLSA Recordkeeping · NAHB Cost of Construction Survey 2025*

### Ready to explore how TaskTag can transform your construction projects?

 Start your free trial today and see the difference!  

[Start Using Tasktag](https://app.tasktag.com/register/signup-with-email)

[tasktag](https://blog.tasktag.com/tag/tasktag), [construction payroll](https://blog.tasktag.com/tag/construction-payroll), [field crew timesheets](https://blog.tasktag.com/tag/field-crew-timesheets), [Construction Time Tracking](https://blog.tasktag.com/tag/construction-time-tracking), [job costing template](https://blog.tasktag.com/tag/job-costing-template), [cost code tracking](https://blog.tasktag.com/tag/cost-code-tracking), [overtime tracking](https://blog.tasktag.com/tag/overtime-tracking), [contractor timesheet template](https://blog.tasktag.com/tag/contractor-timesheet-template), [field time log](https://blog.tasktag.com/tag/field-time-log), [labor cost control](https://blog.tasktag.com/tag/labor-cost-control)

## Related posts

[![](https://blog.tasktag.com/hs-fs/hubfs/1%20-%202026-05-08T013629.642.jpg?height=200&name=1%20-%202026-05-08T013629.642.jpg)](https://blog.tasktag.com/construction-timesheet-template-with-cost-codes)

[job costing template](https://blog.tasktag.com/tag/job-costing-template), [cost code tracking](https://blog.tasktag.com/tag/cost-code-tracking)

## [Contractor Timesheet Template: Free Download + Complete Guide (2026)](https://blog.tasktag.com/construction-timesheet-template-with-cost-codes)

![Picture of Mak Pastrana](https://blog.tasktag.com/hs-fs/hubfs/profile-pic-circle.png?width=50&name=profile-pic-circle.png) [Mak Pastrana](https://blog.tasktag.com/author/mak-pastrana) 

 May 8, 2026, 2:05:51 AM

[Read more](https://blog.tasktag.com/construction-timesheet-template-with-cost-codes)

[![Tasktag vs Bolt](https://blog.tasktag.com/hs-fs/hubfs/TaskTag%20vs%20Bolt%20Feature%20%26%20Pricing%20Showdown.png?height=200&name=TaskTag%20vs%20Bolt%20Feature%20%26%20Pricing%20Showdown.png)](https://blog.tasktag.com/tasktag-vs-bolt)

[project management tool](https://blog.tasktag.com/tag/project-management-tool), [companycam alternatives](https://blog.tasktag.com/tag/companycam-alternatives), [construction tracking software](https://blog.tasktag.com/tag/construction-tracking-software), [general contractor software](https://blog.tasktag.com/tag/general-contractor-software), [contractor management software](https://blog.tasktag.com/tag/contractor-management-software), [job site management app](https://blog.tasktag.com/tag/job-site-management-app), [construction time management](https://blog.tasktag.com/tag/construction-time-management), [construction time sheets](https://blog.tasktag.com/tag/construction-time-sheets), [crew management](https://blog.tasktag.com/tag/crew-management), [digital timesheet](https://blog.tasktag.com/tag/digital-timesheet)

## [TaskTag vs. Bolt: Choosing the Right Construction Management Tool](https://blog.tasktag.com/tasktag-vs-bolt)

[Kang Shen](https://blog.tasktag.com/author/kang-shen) 

 Aug 1, 2025, 9:40:14 AM

Managing construction projects is a juggling act—tasks, schedules, deliverables, crews,...

[Read more](https://blog.tasktag.com/tasktag-vs-bolt)

[![Construction worker viewing a digital timesheet on a tablet, showing daily hours tracked and project tags, representing real-time crew time management with TaskTag.](https://blog.tasktag.com/hs-fs/hubfs/Why%20Crews%20Miss%20Clock-Ins%20and%20How%20TaskTag%20Solves%20Construction%20Timesheets.png?height=200&name=Why%20Crews%20Miss%20Clock-Ins%20and%20How%20TaskTag%20Solves%20Construction%20Timesheets.png)](https://blog.tasktag.com/tasktag-vs-companycam-timesheets)

[companycam alternatives](https://blog.tasktag.com/tag/companycam-alternatives), [tasktag](https://blog.tasktag.com/tag/tasktag), [construction time management](https://blog.tasktag.com/tag/construction-time-management), [construction time sheets](https://blog.tasktag.com/tag/construction-time-sheets), [digital timesheet](https://blog.tasktag.com/tag/digital-timesheet), [GPS time tracking](https://blog.tasktag.com/tag/gps-time-tracking), [time tracking tool](https://blog.tasktag.com/tag/time-tracking-tool), [field crew timesheets](https://blog.tasktag.com/tag/field-crew-timesheets), [crew check-in app](https://blog.tasktag.com/tag/crew-check-in-app), [jobsite attendance tracking](https://blog.tasktag.com/tag/jobsite-attendance-tracking)

## [Why Crews Miss Clock-Ins—and How TaskTag Fixes Construction Timesheets](https://blog.tasktag.com/tasktag-vs-companycam-timesheets)

[Sammy Jones](https://blog.tasktag.com/author/sammy-jones) 

 Sep 26, 2025, 8:25:09 AM

No new apps. No spreadsheets. Just tap, tag, and track it all in one place. The Challenge With...

[Read more](https://blog.tasktag.com/tasktag-vs-companycam-timesheets)

- [Features](https://tasktag.com/features/photo-documentation/)
- [Pricing](https://tasktag.com/pricing)
- [Compare](https://tasktag.com/compare/companycam/)
- [Blog](https://blog.tasktag.com)
- [Resources](https://blog.tasktag.com/product)

---

[![Logo-TaskTag-White 1](https://blog.tasktag.com/hs-fs/hubfs/Logo-TaskTag-White%201.png?width=200&height=88&name=Logo-TaskTag-White%201.png "Logo-TaskTag-White 1")](https://app.tasktag.com)

[facebook-f icon](https://www.facebook.com/TaskTagApp/) [Follow us on LinkedIn](https://www.linkedin.com/company/tasktagapp/) [Follow us on Twitter/X](https://www.twitter.com/tasktag/) [Follow Us on Instagram](https://www.instagram.com/tasktagapp/) [Check Out Our YouTube](https://www.youtube.com/@tasktagapp)

2410 Polk St, Houston, TX 77007

Copyright © 2026

```json
{
  "@context" : "https://schema.org",
  "@type" : "BlogPosting",
  "author" : {
    "@type" : "Person",
    "name" : "Mak Pastrana",
    "url" : "https://blog.tasktag.com/author/mak-pastrana"
  },
  "dateModified" : "2026-06-30T06:34:43.455Z",
  "datePublished" : "2026-05-12T02:34:20.000Z",
  "headline" : "Contractor Timesheet Template: Free Download + Complete Guide (2026)",
  "image" : [ "https://blog.tasktag.com/hubfs/1%20-%202026-05-10T205439.538.jpg" ],
  "mainEntityOfPage" : {
    "@id" : "https://blog.tasktag.com/construction-timesheet-template-with-cost-code",
    "@type" : "WebPage"
  },
  "publisher" : {
    "@type" : "Organization",
    "logo" : {
      "@type" : "ImageObject",
      "url" : "https://blog.tasktag.com/hubfs/tasktag-logo.svg"
    },
    "name" : "TaskTag"
  }
}
```